Monday, June 7, 2010

Chapter 7 - Routing For The Floyd Rose

Now for the important routing.




Same approach as the wiring hole, I did a first pass at 1/4" depth over the whole area..




Then I dropped the Floyd in again to make sure everything was going as planned.



Then I moved on to routing out the back of the bridge area to 7/16".


After routing, it was simply a matter of drilling wire channels through the body for the pickups and jack.  At this point, I'd be ready to start installation, but first, a new skin for Frankie.

No comments:

Post a Comment